Invenio Protocols

Invenio Protocols  /  Research  /  Worldmind  /  Forecast ledger

Ireland · Forecast issue of 19 November 2026

Public forecast ledger

Five questions about Irish demand and prices. Each probability is recorded alongside the figures available at the time, the CSO release that settles the question and the date after which an unanswered call is void.

19 November 2026

The five calls

The probabilities are AI-assisted editorial judgements. Each expresses a degree of confidence in a specific outcome. Scores use the original probability even if the evidence later changes.

Electric cars
65% chance of Yes · December 2026
Wholesale power
55% chance of Yes · December 2026
Consumer prices
40% chance of Yes · January 2027
Housing delivery
55% chance of Yes · Q1 2027
Data centre demand
65% chance of Yes · Calendar 2026

Electric cars

Will electric cars account for at least 30% of new private cars licensed in Ireland in December 2026?

Open · Probability of Yes

65%. A dealer choosing its winter stock mix needs to know how much weight to give October’s electric sales.

What was known
Electric cars made up 1,850 of 4,323 new private car licences in October 2026 (42.8%). The share was 28.6% over January–October. In December 2025 it was 264 of 838 (31.5%).
Why 65%?
Both October and the prior December cleared 30%. December’s small market makes the mix sensitive to one shipment.
How to resolve
Use the CSO Vehicles Licensed for the First Time release covering December 2026. In table 2, use the December column for new private cars. Yes if 100 × Electric is at least 30 × Total. Exclude hybrids and used imports. A zero denominator is unresolvable. CSO release archive.
Publication deadline

October 2026 vehicle licences, table 2 (10 November 2026) · December 2025 vehicle licences, table 2 (13 January 2026)

Wholesale power

Will Ireland’s December 2026 wholesale electricity price index reach at least 125.0?

Open · Probability of Yes

55%. For a manufacturer renewing its power contract, the wholesale series is one check on the price pressure facing suppliers.

What was known
The electricity index rose from 125.8 in August 2026 to 134.4 in September (2021 = 100). A year earlier, the move from November to December 2025 was a fall of 11.7%.
Why 55%?
September leaves room for roughly a 7% decline before the index drops below 125. A fall as large as last December’s would take it below the threshold.
How to resolve
Use the CSO Wholesale Price Index release for December 2026. In table 5 use the monthly index for Electricity, excluding VAT, on the 2021 = 100 base. Yes at 125.0 or higher. If the series is rebased, use only a CSO value explicitly expressed on the original base. CSO release archive.
Publication deadline

September 2026 wholesale prices, table 5 (27 October 2026) · December 2025 wholesale prices, table 5 (22 January 2026)

Consumer prices

Will Ireland’s annual consumer price inflation reach at least 4.5% in January 2027?

Open · Probability of Yes

40%. For a business with CPI-linked charges, the national all-items rate is a reference point for the next pricing review.

What was known
Annual CPI inflation rose from 4.1% in September 2026 to 4.3% in October. Energy products contributed 1.59 percentage points to the October annual change.
Why 40%?
A further rise of 0.2 percentage points would reach the threshold. October’s reliance on energy makes it risky to extrapolate the latest increase.
How to resolve
Use the CSO Consumer Price Index release for January 2027. In table 1 take the published 12-month percentage change in the national all-items CPI for January. Yes at 4.5% or higher. Exclude the HICP and its flash estimate. CSO release archive.
Publication deadline

October 2026 consumer prices, tables 1 and 3 (11 November 2026)

Housing delivery

Will Ireland record at least 8,500 new dwelling completions in the first quarter of 2027?

Open · Probability of Yes

55%. National completions give building-products suppliers a volume benchmark against which to test a sales plan.

What was known
The October 2026 release records 7,856 completions in Q1 2026. Q3 2026 reached 10,154, up 10.4% year on year. In Q2 the count slipped to 8,823 from 9,152 a year earlier.
Why 55%?
The threshold needs 8.2% growth on the comparable first quarter. Q3 beat that pace, but Q2 shows how uneven handovers can be.
How to resolve
Use the CSO New Dwelling Completions release for Q1 2027. In table 1 take the national quarterly total for all dwelling types. Yes at 8,500 or more. Use the unadjusted number of completions. CSO release archive.
Publication deadline

Q3 2026 dwelling completions, table 1 (29 October 2026)

Data centre demand

Will Irish data centres use at least 8,250 GWh of metered electricity in calendar 2026?

Open · Probability of Yes

65%. A national consumption figure gives a buyer of power or cooling equipment a check on a supplier’s demand-growth assumptions.

What was known
The July 2026 release put 2025 demand at 7,663 GWh, up from 6,973 GWh in 2024. Q4 2025 usage was 1,991 GWh.
Why 65%?
Repeating the last annual gain of 690 GWh would clear the threshold. Holding every quarter flat at the Q4 2025 level gives only 7,964 GWh. The forecast concerns the full year, which was already in progress on the issue date.
How to resolve
Use the CSO Data Centres Metered Electricity Consumption release for 2026. In table 1 take Data Centre consumption in GWh for the calendar year. Yes at 8,250 GWh or more. Exclude all other metered customers. CSO release archive.
Publication deadline

2025 data centre release, dated cover (7 July 2026) · 2025 metered demand, tables 1 and 2 (7 July 2026)

Resolution policy

How calls are scored

Use the first CSO statistical release in the named series that reports the specified figure for the period. Table numbering can change. The named metric, geography, units and observation period govern.

Use the value as first published, including a provisional value. Later revisions are recorded separately and do not change the score. Earlier forecasts, partial periods and substitute series are ineligible.

A qualifying value meeting the test resolves Yes. Any other qualifying numeric value resolves No. A delayed or missing figure stays open through 23:59 Europe/Dublin on the stated deadline. If no qualifying value has appeared by then, record Void, including the reason. A release on the deadline counts.

Score each resolved call using (p − y)², with y = 1 for Yes and 0 for No. The issue score is the unweighted mean over resolved calls. Show the counts of open, resolved and void calls separately. Missing and void calls carry no score. A constant p = 0.50 scores 0.25 for every resolved call.

For example, a 65% call scores 0.1225 on Yes and 0.4225 on No. A lower mean score is better. Several calls share exposure to energy prices, so five results offer limited evidence about repeatable forecasting skill.

Fixed issue

Check the original forecasts

The JSON download records the five questions, probabilities, baselines, source links and scoring rules as issued. Its SHA-256 checksum lets you compare your own copy with these exact bytes.

16db6b159ca1fa83bc2947a5d309fc7e198beaa567a6a3ec0cd36462c96d6116

FreeTSA timestamped the file on . Its signed RFC 3161 receipt establishes that these bytes existed by that time.

Save the original issue, the receipt and FreeTSA’s CA certificate in one directory, keeping their filenames. Forecasts (JSON) · Signed timestamp (.tsr) · FreeTSA certificate (cacert.pem).

Run this command from that directory to verify the receipt against the file.

openssl ts -verify -data forecast-issue-2026-11-19.json -in forecast-issue-2026-11-19.tsr -CAfile cacert.pem